Our roads, including the main road in the subdivision, are private roads.
We formed a road district with the county in 2005. It has been a long process, but
We still have 1/2 mile of unpaved road between our subdivision and the Viewpoint subdivision.
The only maintenance is occasional grading, when and if there is money in the road
fund. The road has two basic states: 1) dry and dusty; 2) muddy. These pictures of the
main road demonstrate the two states. This situation changed.
finally, the main road is paved. They finished paving it 4/16 and are now just putting
on the finishing touches. The county now owns the road and will maintain it. The cost we
paid for the road ended up being reasonable because of the poor economy. The engineering
extimate for the three miles was $3.2 million and the winning bid, of 12 bids, was $1.6 million.
That resulted in costing us landowners considerably less than had been anticipated.
We had to pay for the road.
We're hopeful it won't be too long before that section gets paved, but it will probably be
quite a while. Still, having a mile less of rough, muddy road is great.
| The road looking south towards Prescott Valley in its normal
dry state The road looking south after a rain storm
| |
|
|
The road looking north in its normal dry state
| The road looking north after a rain storm
| |
|
|
My Ford Exporer before I bought mud flaps for it
| Shot from same position as above with telephoto lense to highlight | the 'lake' in the middle of the road to the north. It is about one block long and folks have to make a very wide detour (out of the picture to the right) to get past it. |
|
|
April 2010 south looking towards town.
| April 2010 looking north.
| |
|
|
| Low spot where lake formed is now a low water crossing
engineered to allow water to flow across the road. | |
|
May 2010 south looking towards town.
| May 2010 looking north.
| |
|
|
| Close up view. | |
|